Changelog
You'll find significant changes to the project and project files here.
12.7.2026
Adds Flap Sorting Box / Accessories section.
12.6.2026
- Reworked the Building Displays section into "Building Installations" — clearer structure, sharper distinction between connection boards and injector boards, and a new section on addressing individual modules
8.6.2026
- Added Section on Building Displays
- Major new Kraken Part for BYJ (much better fit)
25.5.2026
- Improved Flap Guide
- Additional End-Piece Back Case Part
- Added our first community part!
- Added installation instructions to the Electronics section
4.5.2026
- New front case with better support on the right side.
3.5.2026
- New universal back case with alignment guides
2.5.2026
- Updates Front Case model for better printability
- Added built plate
- Added sourcing instructions for the motors
26.4.2026
Changed Back Case and Drum Models to move from Heat Inserts to screwing the fasteners directly into plastic. Same mechanical properties, smaller BOM.