Skip to main content

Changelog

You'll find significant changes to the project and project files here.

12.7.2026​

Adds Flap Sorting Box / Accessories section.

12.6.2026​

  • Reworked the Building Displays section into "Building Installations" — clearer structure, sharper distinction between connection boards and injector boards, and a new section on addressing individual modules

8.6.2026​

  • Added Section on Building Displays
  • Major new Kraken Part for BYJ (much better fit)

25.5.2026​

  • Improved Flap Guide
  • Additional End-Piece Back Case Part
  • Added our first community part!
  • Added installation instructions to the Electronics section

4.5.2026​

  • New front case with better support on the right side.

3.5.2026​

  • New universal back case with alignment guides

2.5.2026​

  • Updates Front Case model for better printability
  • Added built plate
  • Added sourcing instructions for the motors

26.4.2026​

Changed Back Case and Drum Models to move from Heat Inserts to screwing the fasteners directly into plastic. Same mechanical properties, smaller BOM.